Coral / sand have now been carried down and ground is almost filled, except for a section near the steps, as Contractor feels another step has to be added,
![](/blog/wp-content/uploads/2011/February/February_01_2011/IMG_1390.jpg)
![](/blog/wp-content/uploads/2011/February/February_01_2011/IMG_1392.jpg)
The additional step at the base of the stairway will reduce the height of the first step upwards, i.e to make it less difficult for people going up and down.