Piping Continues, and Preparations for Iraivan Anniversary
April 6, 2024Trenching for water piping and optical fiber continued from the San Marga parking lot corner down the pasture slope and to the edge of our water ditch winding through our property and feeding the ponds. The second photo shows the ditch, and Pradip, our contractor, is going to dig a tunnel underneath the ditch to sending the piping through. Then he will continue trenching parallel to the San Marga Path.
The third photo shows a just-painted pyramid structure that will hold about 130 small kumbhas for the first annual Iraivan Temple anniversary pujas on April 11-12. More preparatory photos will come soon.
}
];